Campus Improvement Projects- Phase I
Russell J. Salvatore Student Dining Room (COMPLETED)
Lunch should be an enjoyable and relaxing part of the school day
day. It should be a time to take a break from classroom work,
recharge, and build relationships with classmates while
getting the nourishment they need to finish the day strong.
Students who regularly eat a nutritious lunch and have an
opportunity to decompress and do better academically,
feel more connected to the school, and have fewer behavioral
issues. Thanks to the generosity of Russell J. (Russ) Salvatore, our
student dining room has been transformed into a welcoming
and comfortable space that will make a true difference for the mental and physical health of our current and future students.
Performing Arts Wing- Nearing Completion
Chorus and Instrumental Music are essential components of
our Fine Arts Program. The nearly fifty students participating
in the chorus and sixty musicians on campus not only perform
regularly but are the foundation for our fall drama and spring
musical each year. Appropriate and dedicated facilities are
needed for them to explore and develop their talents fully. A
reimagined 3500 square foot footprint, including new rooms
for chorus and instrumental music, has been developed at the
end of the first floor of Justin Hall and the lower level of
Alumni Hall. In addition to acoustically treating the rooms,
new ergonomically correct furniture and adequate storage
have been purchased.
SFHS Instrumental Music and Chorus Rooms
Fitness Center/Athletic Training Room- Scheduled for completion January 2026
Opened in 1993 in what was intended to be a storage area,
the current Fitness Center does not meet the needs of our
community and is severely outdated. Once used almost
exclusively by interscholastic athletes, fellow students, faculty
, and staff now frequently use the facility, reflecting a societal
shift where wellness and physical fitness is top of mind. In
addition, training methods have changed considerably,
incorporating new and different types of equipment and
techniques. The Fitness Center and Athletic Training rooms
are being relocated to what is currently the Activity Center and
includes new flooring, lighting, wall coverings, and HVAC.
New equipment has been purchased, the bathrooms updated
and an office was added for supervision.